projects eh
priorities 1 fit new exhaust to fireblade ..two of the studs sheared removing the old pipe so need to get them out first a b*****d of a job
2 kawazuki rebuild stripped to frame for polishing, most of the machining
done, 1260 bore kit fitted, gixxer cams to be fitted , then dyno time to
get it running right and rebuild the chassis ,paint work to sort.
3 gsxr 1100 streetfighter to build, big bits done except welding & the
12000 other bits and bobs that become apparent during a build
4 s/s gt ..easy one this ....fix puncture,fit on-one carbon forks
5 sell rockhopper/rocklobster & 3 others (to be determined)
6 build 93 palisades trail from f***ed eldridge grade carcas
7 finish building 500mm x 1m gantry cnc router
8 build s/s out of gt frame found in skip last weekend (i know should have
left it alone but)
9 build new shed at bottom of garden
oh and then there's the kitchen
wonder what will get top priority
mike