Get myself a CNC mill, or failing that, a manual one cos I have this itch to have a bash at component building.
That's gonna have to wait til after the house move April-ish next year when I hope to be higher up the Malverns, with more sheds / workshops than the two I have now
That's gonna have to wait til after the house move April-ish next year when I hope to be higher up the Malverns, with more sheds / workshops than the two I have now