thatmattwooding
Dirt Disciple
Out for an installation ride this morning. Not exactly issue free. Still, most of the bike is working well.
The front ‘triangle’ is from a 2000 Shoreline Trail and the swingarm is from a 1999 East Peak.
I need to swap the bars for something with a bit of rise, re-do some cables, do the gears again (made a proper horlicks of that), etc.