Unfinished bike project "GT Zaskar 97 & RS MAG SL Titanium"

konrik80

Retro Guru
Feedback
View
Hi, I have an unfinished GT Zaskar 97 RS MAG SL Titanium bike project.

Gallery:
https://photos.app.goo.gl/3JUtu57VnEkjk3bKA

1. Gt Zaskar 97 frame 18" - £200 + kinesis alu rigid fork (as a gift)
2. Rock shock Mag SL Titanium - £240
https://photos.app.goo.gl/pg9NbxZxG6RxkEu56
3. Chris King aheadset - £80 (like new, complete with top cap)
4. Syncros stem - £30
5. Syncros seatpost 27,2 £40
6. Shimano Deore xt hb/fh-m737 + cs-m737 cassette + mavic 517 rims wheelset - £140
7. Selle Italia Tri Matic - £30
8. Shimano deore XT bb-un72 - £20
9. Shimano deore LX crankset with Kooka chainring + Tioga pedals as agift - £50
10. Diacompe Levers + tektro cantis - £20
11. Shimano deore LX sl-m569 shifters 3x8 - £40
12. Shimano rear mech deore XT rd-m737 - £40
13. True Temper Bars - £20

... that makes a sum of £950 for all the items,
but I am looking for £800 total posted for the whole project or nearest offer.
I prefer to seel it as a project set to one buyer.

All the parts are 100% fine, very good condition.
Frame has only one dint on the top tube, very small. RS SL Titanium is in very good condition.
No issues at all! Please Feel free to PM.


EU/UK/US shipping + £30 for large package, £15 for smaller ones.
Priority postal parcel from PL.

(Paypal payment accepted, F&F/gift or fees)
 

Attachments

  • DSCF4524.JPG
    DSCF4524.JPG
    75.1 KB · Views: 648
  • DSCF4503.JPG
    DSCF4503.JPG
    124.5 KB · Views: 650
  • DSCF4497.JPG
    DSCF4497.JPG
    221.9 KB · Views: 650
  • DSCF4487.JPG
    DSCF4487.JPG
    202.1 KB · Views: 650
  • DSCF4561.JPG
    DSCF4561.JPG
    158.5 KB · Views: 647
  • DSCF4492.JPG
    DSCF4492.JPG
    208.1 KB · Views: 647
Re: Unfinished bike project "GT Zaskar 97 RS MAG SL titanium"

Hello,
I'm interested the seat post, is it uncut ?
 
Re: Unfinished bike project "GT Zaskar 97 RS MAG SL titanium"

Hi Poco72,
yes the seat post is uncut (with a patented hole). I am sorry but I already have an offer for the whole project (which is priority to me).
 
Back
Top