kaiser":3e3l8frj said:
zigzag":1jkbfdfu said:Last time I was down I mind seeing some tents on the other side of that building.
Trail maintenance work with digger on Spookywood Descent from Tue 5th Oct until end of Oct. Look out for short diversion at the top of Spookywood Descent (rejoins descent approx. 1/3 way down) until mid October. From mid Oct to end Oct look out for digger working on lower sections of Spookywood Descent. Trail will be open but riders will be asked to stop and dismount then walk through worksite when signalled by operator.