Re:
Does 11 years class as a long term project
I hope everyone is safe and well in these strange times.
Well, as we all isolating as best we can I’ve got the chance to go through boxes and bikes thinning the crop and finding parts etc for bikes I’m keeping and selling.
For the last 5 years I’ve bought parts here and there putting them in boxes in the garage. Now I’ve unpacked I’ve realised I’ve got most of the parts to finish all the bikes I’m keeping.
I’ve decided to follow the pictures / spec that originalshinkicker kindly posted.
I’m working on the paintwork which will be done soon and I’m getting Argos cycles to refit the rack/mudguard fixing that was removed.
All the other Ali parts are going to acorn for refinishing.
I’ve got a nukeproof front hub but it’s 28 hole , any ideas what the rim is in the pic, I’ve got a none describe dark rim but it’s not right.
I do need a ti USE post , I’ve fitted and ali one for the time being. I need a set of salsa pro bars, I’ve fitted a specialized set for the time being