Re:
A few more details:
The frame only had one bottle cage so I added another. I did this after decaling otherwise I would’ve needed to cut the decal around the new bosses. These were added with a nutsert tool. Alloy nutserts because I don’t have an air-powered tool (stainless are also available but can’t be installed well with the hand tool. They will feel firm at first but quickly start to spin). I used a good blob of copper grease around each one, I do this on all my bikes when putting dissimilar metals together.
A few more details:
The frame only had one bottle cage so I added another. I did this after decaling otherwise I would’ve needed to cut the decal around the new bosses. These were added with a nutsert tool. Alloy nutserts because I don’t have an air-powered tool (stainless are also available but can’t be installed well with the hand tool. They will feel firm at first but quickly start to spin). I used a good blob of copper grease around each one, I do this on all my bikes when putting dissimilar metals together.