Re:
Spent most of my day in man cave organising tool rack, wrapping two chainstays with old inner tube further strip down of 2nd retro bike, then last 3 hours wet n dry prepping a stem, wet n dry 180/400/1000 grade then autosol on sti brake /lever combo, cantis and chainset 8)